| Title /Author | Event | Date |
|---|---|---|
| The Role of ECA in the Development of Dynamic Riser Systems M. Campbell, S. Jones - 2H, J. Korloo - Unocal | OMAE 2003 | Jun 2003 |
| Design Challenges Of Deepwater Dry Tree Riser Systems for Different Vessel Types F. Lim, C. Chedzoy | ISOPE 2003, Honolulu | May 2003 |
| Deepwater Riser System Challenges and Issues D. Walters | SPE, Gulf Coast Section, Houston | Apr 2003 |
| 2H Subsea Standalone Data Monitoring System P. An, N. Willis, S. Hatton | 6th SUT Symposium, Aberdeen | Apr 2003 |
| Deepwater Riser System Challenges and Issues D. Walters | SPE Conference, Gulf Coast Section, Houston | Apr 2003 |
| Riser Design H. Howells | Marine Risks Workshop, International Association of Oil & Gas Producers | Mar 2003 |
| Effects of High Temperature on the Design of Deepwater Risers S. Hatton | SUT | Mar 2003 |
| Recent Developments in Free Standing Riser Technology S. Hatton, J. McGrail, D. Walters | 3rd Workshop on Subsea Pipelines | Dec 2002 |
| Steel Catenary Risers - Results and Conclusions from Large Scale Simulations of Seabed Interaction C. Bridge, N. Willis | DOT 2002 | Nov 2002 |
| Reducing Drilling Costs - A High Pressure Small Bore Drilling Riser System S. Hatton, H. Howells, M. Hudson | OPT 2002 | Nov 2002 |




