Our Locations
2H Offshore
Title /Author Event Date
The Role of ECA in the Development of Dynamic Riser Systems
M. Campbell, S. Jones - 2H, J. Korloo - Unocal
OMAE 2003Jun 2003
Design Challenges Of Deepwater Dry Tree Riser Systems for Different Vessel Types
F. Lim, C. Chedzoy
ISOPE 2003, HonoluluMay 2003
Deepwater Riser System Challenges and Issues
D. Walters
SPE, Gulf Coast Section, HoustonApr 2003
2H Subsea Standalone Data Monitoring System
P. An, N. Willis, S. Hatton
6th SUT Symposium, AberdeenApr 2003
Deepwater Riser System Challenges and Issues
D. Walters
SPE Conference, Gulf Coast Section, HoustonApr 2003
Riser Design
H. Howells
Marine Risks Workshop, International Association of Oil & Gas ProducersMar 2003
Effects of High Temperature on the Design of Deepwater Risers
S. Hatton
SUTMar 2003
Recent Developments in Free Standing Riser Technology
S. Hatton, J. McGrail, D. Walters
3rd Workshop on Subsea PipelinesDec 2002
Steel Catenary Risers - Results and Conclusions from Large Scale Simulations of Seabed Interaction
C. Bridge, N. Willis
DOT 2002Nov 2002
Reducing Drilling Costs - A High Pressure Small Bore Drilling Riser System
S. Hatton, H. Howells, M. Hudson
OPT 2002Nov 2002


You will need Acrobat® Reader software installed on your machine to view technical papers

Acrobat� Reader�